Dhaka topographic map
Interactive map
Click on the map to display elevation.
About this map
In 2013, suburban services to Narayanganj and Gazipur cities were upgraded using diesel-electric multiple-unit trains. The Dhaka Metro Rail feasibility study has been completed. A 20.1-kilometre (12.5 mi), $2.8-billion Phase 1 metro route is being negotiated by the Government with Japan International Cooperation Agency. The first route started from Uttara, a northern suburb of Dhaka, to Agargaon, in the south of the capital. It was eventually extended north to Uttara and truncated south to Motijheel. Initiatives have been taken to extend MRT Line-6 from Motijheel to Kamalapur. Topographic Survey has already been completed. Social Survey in progress. The length of this part is 1.17 km. This will enable the passengers of Kamalapur railway station to travel by metro rail. The route comprises 16 elevated stations, every 180 metres (590 ft) long. Construction began on 26 June 2016.
Other topographic maps
Click on a map to view its topography, its elevation and its terrain.
Dohar
Bangladesh > Dhaka Division > Dohar Subdistrict
Dohar, Dohar Subdistrict, Dhaka District, Dhaka Division, 1330, Bangladesh
Average elevation: 7 m